Project # 20051089

SUBDIVISION LAND DEVELOPMENT
North side of Port Penn Road, directly across from Jefferey Pine Drive. Propose 54 single-family conservation design option. S Zoning. CD 12. St. George's. Southern Alliance
ELKINS HELEN M & VANALEN MARIS M
RECORDED/RESOLV
BRADFORD S SHOCKLEY
STEPHEN HOKUF JR.

+
  Applicant's Submissions and Correspondence

+
  Other Agency Comments, Reviews & Approvals

+
  Planning Review Reports

+
  Studies, Reports and Data

+
  Board Recommendations and Input

+
  Legal Agreements and Documents

+
  Miscellaneous Documents

+
  Procedural Documents

+
  Records Relating to Proceedings

+
  Plans

Subdivision Land Development

Planning

No
3/8/2006
11/24/2014
TAC REVIEW

Ground Floor Area

0
0
0
0

Acres

0
0
0
0
0

Residential Lots

54
54

Acreage

57
44
8
1
110

Inspections

Inspection # Inspection Type Scheduled Date Status Completion Date
1500116 OPEN SPACE INSP (RESIDENTIAL) Not Available Incomplete Not Available
1500117 RECORD COMPLIANCE INSPECTION Not Available Incomplete Not Available
1500118 RELEASE OF BONDS Not Available Incomplete Not Available
1500119 ROAD BOND INSPECTION Not Available Incomplete Not Available
1500120 FIELD INSPECTION OF FACILITIES Not Available Incomplete Not Available
1500121 ENGINEERING OPEN SPACE AT 50 Not Available Incomplete Not Available
1500122 ENGINEERING OPEN SPACE AT 75 Not Available Incomplete Not Available

Fees

Date Applied Description Status Amount
9/30/2005 EXPLORATORY PLAN FEE Paid $500.00
11/29/2006 REVISED EXPLORATORY PLAN FEE Paid $500.00
8/6/2007 PRELIMINARY PLAN FEE WITHOUT REZONING Paid $500.00
8/6/2007 (ENG) PRELIMINARY PLAN REVIEW FEE Paid $520.00
8/8/2007 ENGINEERING RESUBMISSION FEE Paid $500.00
7/8/2008 ENGINEERING RESUBMISSION FEE Paid $500.00
2/18/2009 (ENG) SEWER PLAN FEE Paid $1,500.00
3/18/2009 RESIDENTIAL SWM FACILITY MAINT FUND Unpaid $1.00
3/18/2009 MAJOR RECORD PLAN FEE (RES. SUBDIV) Paid $7,900.00
3/18/2009 AGREEMENT FEE Paid $250.00
3/18/2009 (ENG) RECORD PLAN REVIEW FEE Paid $1,470.00
3/18/2009 (ENG) GENERAL GRADING RESIDENTIAL FEE Paid $725.00
3/18/2009 (ENG) STORM WATER MANAGEMENT E&S FEE-RES Paid $38,444.00
5/7/2009 ENGINEERING RESUBMISSION FEE Paid $750.00
9/30/2010 ENGINEERING RESUBMISSION FEE Paid $750.00
10/19/2010 PLAN EXPIRATION EXTENSION Paid $50.00
10/19/2010 PLAN EXPIRATION EXTENSION Paid $50.00
10/26/2010 LDIA PROCESSING FEE Paid $250.00
9/20/2011 LDIA PROCESSING FEE Paid $250.00
12/20/2012 LDIA PROCESSING FEE Paid $250.00
8/26/2014 LDIA PROCESSING FEE Paid $250.00
11/26/2014 STORMWATER AS-BUILT PLAN REVIEW FEE Unpaid $250.00

Conditions

Application Date Description Action Date Action Description
9/30/2005 PRE-APPLICATION CONFERENCE 12/1/2005 COMPLETED
9/30/2005 SIGNED AFFIDAVIT FOR POSTING 3/17/2006 RECEIVED
8/6/2007 NOTIFICATION OF TAC AGENCIES 7/15/2008 COMPLETED
8/6/2007 SUBAQUEOUS LANDS PERMIT 7/15/2008 NOT APPLICABLE
8/6/2007 CRITICAL NATURAL AREA APPROVAL 7/15/2008 NOT APPLICABLE
8/6/2007 OFFICE OF AERONAUTICS APPROVAL 7/15/2008 NOT APPLICABLE
8/6/2007 COASTAL ZONE APPROVAL 7/15/2008 NOT APPLICABLE
8/6/2007 ARMY CORPS PERMIT APPROVED 7/15/2008 NOT APPLICABLE
8/6/2007 DELDOT COMMENTS RECEIVED 7/15/2008 RECEIVED
8/6/2007 DRAFT TAC REPORT 7/15/2008 COMPLETED
8/6/2007 TAC REVIEW AT PLAN BOARD MTG 7/15/2008 COMPLETED
8/6/2007 FINAL TAC REPORT 7/15/2008 COMPLETED
8/6/2007 FIRE MARSHAL COMMENTS RECV'D 7/15/2008 RECEIVED
8/6/2007 SIGNED AFFIDAVIT FOR POSTING 9/17/2007 RECEIVED
3/18/2009 WATER CERTICATION RECEIVED 4/26/2010 RECEIVED
3/18/2009 SSSA 15% FEE REQUIRED? 4/17/2009 NOT APPLICABLE
3/18/2009 LAND DEV IMPROV AGREE RECORDED 9/10/2014 APPROVED
3/18/2009 PLAN RECORDATION 11/26/2014 APPROVED
3/18/2009 DELDOT APPROVAL LETTER 10/19/2010 APPROVED
3/18/2009 FIRE MARSHAL APPROVAL RCV'D 6/22/2009 APPROVED
3/18/2009 COUNTY COUNCIL REC PLAN APPROV 11/26/2014 APPROVED
3/18/2009 NOI CONFIRMATION RECEIVED 10/19/2010 RECEIVED
3/18/2009 RECORDER OF DEEDS FEE RECEIVED 3/19/2009 RECEIVED
3/18/2009 GENERAL MANAGER RECRD PLAN APR 11/26/2014 APPROVED
3/18/2009 SCHOOL CERTIFICATION LETTER Not Available
11/26/2014 75 PERCENT MAINT ESCROW FUND Not Available
11/26/2014 OUTFALL DATA SHEET RECEIVED Not Available
11/26/2014 SANITARY SEWER Not Available
11/26/2014 MONUMENT CERTIFICATION Not Available
11/26/2014 90 PERCENT MAINT ESCROW FUND Not Available

Reviews

Review Type Status
PRELIMINARY TRAFFIC ANALYSIS Approved
EXPLORATORY SUBMISSION REVIEW Approved
HISTORIC REVIEW EXPLORATORY Approved
SEWER CAPACITY AT EXPLORATORY Approved
STAFF MEETING Approved
ENG: EXPLORATORY REVIEW Approved
OS REVIEW AT EXPLOR SPEC SERV Approved
TRAFFIC IMPACT STUDY Conditional Approval
EXPLORATORY REVIEW BY PLANNING Conditional Approval
SEWER DESIGN AT EXPLORATORY Conditional Approval
INITIAL MAPPING REVIEW Conditional Approval
SEWER DESIGN AT PRELIMINARY Conditional Approval
ENGINEERING PRELIMINARY REVIEW Waived
OS REVIEW AT PRELIM SPEC SERV Conditional Approval
ENVIRONMENTAL IMPACT ANALYSIS Conditional Approval
SEWER CAPACITY AT PRELIMINARY Approved
PRELIMINARY PLAN REVIEW Conditional Approval
TRANSPORTATION COMPLIANCE REV Conditional Approval
PRELIMINARY SUBMISSION REVIEW Approved
PUBLIC SAFETY REVIEW AT PRELIM Conditional Approval
ENGINEERING PRELIMINARY REVIEW Waived
ENGINEERING PRELIMINARY REVIEW Approved
RECORD PLAN REVIEW Approved
LANDSCAPE PLAN REVIEW Approved
FINAL MAPPING REVIEW Approved
RECORD PLAN SUBMISSION Approved
PERFORMANCE GUARANTEE REVIEW Approved
PUBLIC SAFETY REVIEW AT RECORD Conditional Approval
TRAFFIC REVIEW AT RECORDATION Conditional Approval
MAINTENANCE DECLARATION REVIEW Approved
SPEC SERV FINAL SEWER REVIEW Approved
ENGINEERING RECORD PLAN REVIEW Waived
ENGINEERING RECORD PLAN REVIEW Waived
ENGINEERING CONSTRUCTION PLAN Denied
ENGINEERING CONSTRUCTION PLAN Conditional Approval
ENGINEERING CONSTRUCTION PLAN Approved
ASMNT ASSIGNS PARCELS/ADDRESS Approved
NOTIFY APPLICANT PROJECT @ 75% Incomplete
INITIATE OPEN SPACE TURNOVER Incomplete
AS-BUILT FOR STORM WATER MNGMT Incomplete
SWM ASBUILT APRVL BY NCC ENG Incomplete
OPEN SPACE STATUS REPORT AT 75 Incomplete
NOTIFY APPLICANT PROJECT @ 50% Incomplete
NOTIFY APPLICANT PROJECT @ 90% Incomplete
OPEN SPACE STATUS REPORT AT 50 Incomplete
PRE EXPLORATORY SKETCH PLAN Approved